供应商送检物料流程图说明
Explanation of Flow Chart of Parts Sent for Inspection

1. 物资部协助将物料安全、整齐卸置至待检区,并请CKY检验员挂待检标识牌。
   Material department assists to download parts safely and put them orderly in inspection-waiting area. CKY receiving inspectors label the parts with a sign Inspection-Waiting.
2. A.由供应商(也可由采购员代填)齐全、准确地填写物料送检单,并提交送检单和供应商检测报告给CKY检验员;
   Suppliers (or CKY purchasers) fill in Inspection Application Sheet completely and accurately then send the sheet to receiving inspectors together with inspection report from suppliers.
   B. 供应商与CKY检验员共同提取检测样件;
   Suppliers randomly pick out some parts for inspection together with CKY receiving inspectors.
   C. CKY检验员进行检测。
   CKY receiving inspectors inspect the parts.
3. A.CKY检验员检验合格后加盖检验合格章,并在物料外包装上粘贴合格标签;
   Once the parts pass inspection, CKY receiving inspectors put QUALIFIED seal on Inspection Application Sheet and label the lot of parts with sign QUALIFIED PARTS.
   B.进入下一流程。
   Parts go through next flow.
4. A.由CKY检验员在物料外包装上粘贴不合格标签;
   If the parts fail to meet print requirement, CKY receiving inspectors label the parts with sign UNQUALIFIED PARTS
   B.外检检验员通知供应商或采购部物料检测不合格结果;
   CKY receiving inspectors inform suppliers or CKY purchasers of the unqualified parts.
   C.供应商和采购部协调后确定不合格物料处理方式。
   Suppliers and CKY purchase department decide the disposal of unqualified parts after discussing.
   D.进入下一流程
   Parts go through next flow.
5. A.由供应商或采购部办理让步接受单
   Suppliers or CKY purchasers send Deviation Application.
   B.让步接收经EK批准后,由CKY检验员盖让步接收章
   CKY receiving inspectors put DEVIATED seal after the deviation is finally approved by EK.
   C.进入下一流程
   Pars go through next flow.
6. A.由供应商售后服务人员在待检区现场挑选分离,并请CKY检验员将挑选合格物料挂待检标识牌,将不合格物料挂检验不合格标识牌
   Supplier after-sale servicer person sort the parts at receiving-waiting area. CKY receiving inspectors label the qualified parts and unqualified parts with different signs.
   B.进入下一流程
   Parts go through next flow.
7. A.由CKY检验员加盖检验不合格章
游客,本贴VIP会员可浏览,点击这里“自动升级VIP会员”,可快速永久浏览本站所有内容!
会赚钱的人用钱买时间,不会赚钱的人用时间换钱;
主动学习,提升自己,战胜对手,梦想才能变为现实!

版权声明:

1、在本站内发表的内容仅代表作者本人观点,与本网站立场无关。

2、转载或引用本网站中的署名文章,请按规定向原作者获得授权。

3、对于不当转载或引用本网站内容而引起的民事纷争、行政处理或其他损失,本网站不承担责任。

4、对不遵守本声明或其他违法、恶意使用本网站内容者,本网站保留追究其法律责任的权利。

5、免责声明:PMC资源网所发布的一切文章和资料仅限用于学习和研究目的,不得将上述内容用于商业或者非法用途,否则,一切后果请用户自负。本站信息来自网络,版权争议与本站无关。您必须在下载后的24个小时之内,从您的电脑中彻底删除上述内容。如果您喜欢或需要该内容,请联系作者,购买授权,得到更好的服务。如有侵权请邮件与我们联系处理(邮件地址:admin@pmczy.com)。

关闭

站长推荐上一条 /2 下一条

工厂管理秘籍


QQ|手机版|PMC资源网 ( 部分资源来自网络,仅供个人学习 。蜀ICP备14016815号-2 )

GMT+8, 2024-5-21 04:53 , Processed in 0.078270 second(s), 29 queries .

Powered by Discuz! X3.4

© 2007-2024 PMCZY.COM

快速回复 返回顶部 返回列表